LV switchgear inspection and FAT (Factory Acceptance Test) activities
Electrical testing (IR, HV/LV, continuity, and functional tests including DOL, S-D, SS, VFDs, primary and secondary injection)
Visual inspection, GA verification, and torque verification 06/04/2026
07/04/2026